Выбрать главу

Ron Holland was born and grew up in New Zealand, sailing from an early age. After secondary school he served an apprenticeship in boat building and, as a part of that, took some drafting and design courses. He then went to the United States and worked in California for a well-known designer, Gary Mull, and later, in Florida, for Charley Morgan of Morgan Yachts. He met the sailing-oriented family of Carlins there and married their daughter Laurel. In 1973, sailing his own boat, he won the world quarter-ton championships. The boat was called Eyghtene (after the Australian pronunciation of “eighteen”). After the world championships Ron was living aboard the little twenty-four-footer in the Hamble River in England when he was approached by a young Cork businessman about designing a one-tonner. Ron and Laurel came to Cork to talk about it, fell in love with Ireland, and stayed. Golden Apple performed brilliantly but erratically in the world one-ton championships in 1974, but she was obviously the fastest boat there and caught the attention of everybody, including the yachting press, and Ron’s reputation soared.

Back in Cork, Southcoast Boatyard, which had built Golden Apple, asked him to design a half-tonner to be built in time for the world half-ton championships at La Rochelle, in France. The boat, the original Golden Shamrock, was rushed to completion and arrived in La Rochelle barely in time for the first race. Because of a stretching of rigging which had occurred on the passage to France, and the lack of time to replace it, Shamrock was dismasted in the first race. Somehow, another mast was obtained immediately, and the crew stayed up all night rigging the boat. After that, she performed spectacularly, even in survival conditions, and the decision was made to put the design into series production in glass fiber. Now Ron had another one-off design, a two-tonner intended for the Irish Admiral’s Cup team, and the biggest boat he had yet designed. This, he hoped, would be as important a boat as Golden Apple, but he still wanted more designs in series production. The dying of the Quest 32 was a blow.

In Cork I also met John McWilliam, the sailmaker, and had another talk with Barry Burke at Southcoast. I also had a talk with Ron’s landlord, and told him I was very interested in the cottage. He seemed amenable to having me there.

A few days later, as my Aer Lingus flight took off from Shannon Airport, headed for New York, then Georgia and the Christmas holidays, a broad plan had come together for the project: move to Cork in February, study navigation all winter and sail during the spring on any boat whose skipper would have me; the boat would start building May 1 and be launched July 1; then sail her intensively, going out to southwest France and northwest Spain or perhaps even the Azores with friends, then sail back to Crosshaven, single-handed, for my qualifying cruise. (I wanted to sail more than the minimum five hundred miles, hoping that a longer qualifying cruise would count with the race committee against my inexperience.)

The cottage would have, within a five-mile radius, the boatyard, the designer, and the sailmaker. Both Ron and John McWilliam had promised me as much time as they could spare in tuning the boat and helping me to learn to sail her. The only big question mark was the money, and that would be resolved, one way or the other, when I arrived in the States.

It seemed a very neat program. I could only hope that, in my ignorance, I had not made it too neat, had not failed to take some hugely important factor into account which, when it emerged, would wreck the whole project. If my own funds wouldn’t cover the cost, then there was the possibility of commercial sponsorship. I felt that if I had to I could probably do a better job than most in attracting commercial attention, since I had spent all of my working life in advertising, dealing on a daily basis with the sort of people I would have to approach.

The novel would have to wait a couple of years, but then, a novel can always wait, as any novelist can tell you.

The project was all there, in outline; I could do nothing more until January, except think about it. And until January I would think about nothing else.

7

Things begin to gel

Manchester, Georgia, is a town of about six thousand people, located about seventy miles south of Atlanta, the state capital. It is, perhaps, two hundred fifty miles from the nearest body of salt water, and the populace is not made up of sailing enthusiasts. A boat is something you row or propel with an outboard motor and is used in the catching of largemouth bass and catfish. To my mother, who is not interested in fishing, boats mean even less.

Dot, which is short for Dorothy and is what I have called her ever since I learned to talk, did not quite seem to get it when I explained to her what I planned to do. I spread out the plans for the boat and explained it all again. Still, I don’t think the penny dropped until a few days later. We were sitting in her car in a supermarket parking lot, about to drive home with the groceries, when she asked suddenly, “Are you really going to do this?”

“Do what?” I asked. We had not discussed the subject since the day before.

“Sail that little boat across the Atlantic Ocean by yourself.”

“Yes.”

Gene Spain, our family life insurance man, happened to be strolling through the parking lot at that moment. Dot rolled down the car window. “Gene, I want you to come by the house,” she said. “I want to talk to you about some insurance.” Gene forgot about his grocery shopping.

A few minutes later the two of them had worked out the details of a fairly hefty policy on my life, over my strenuous protests. “What do I need with insurance?” They ignored me.

“Do you want double indemnity?” asked Gene. “There’s only a small additional premium.”

“How much is treble indemnity?” asked my mother.

After that she seemed resigned to the idea. She learned long ago that it is difficult to talk me out of something I’m excited about. We met with the family attorney to sort out my grandfather’s estate, and I discovered to my astonishment that my estimate of what he had left me was short by half. Now I could afford the Shamrock and all the necessary equipment.

I had to cut my stay short by a few days in order to get to London in time for the tail end of the London Boat Show. I stopped off in New York for a day and managed to see half a dozen old friends, then flew to Shannon. Harry McMahon met me the next day at Lough Cutra, and we drove to Cork to catch the ferry to England. But first I had two things to accomplish in Cork.

First, I went to Southcoast Boatyard and, after some discussion, worked out a deal with Barry Burke: I would buy the standard boat at the full price, then the boatyard would carry out any alterations I wanted and maintain the boat until the start of the race at cost for materials and at cost plus ten percent for labor. The boatyard would also obtain any extra gear I required at trade prices. We signed the contract; Barry gave me a letter outlining the alteration and maintenance and equipment agreement, and I gave him a £500 deposit. We agreed on half the remaining price being paid at the time of molding, May 1, and the remainder on launching, July 1. Harry witnessed the contract. I was delighted with the arrangement and felt it was a good one for both of us. Barry seemed to think so, too.