By a freak of geography and global politics, Egypt possesses the same sort of choke point on Europe-to-Asia telecommunications as the Suez canal gives it in the shipping industry. Anyone who wants to run a cable from Europe to East Asia has severely limited choices. You can go south around Africa, but it's much too far. You can go overland across all of Russia, as U S West has recently talked about doing, but if even a 170-kilometers terrestrial route across Thailand gets your customers fumbling for their smelling salts, what will they say about one all the way across Russia? You could attempt a shorter terrestrial route from the Levant to the Indian Ocean, but given the countries it would have to pass through (Lebanon and Iraq, to name two), it would have about as much chance of survival as a strand of gossamer stretched across a kick-boxing ring. And you can't lay a cable down the Suez Canal, partly because it would catch hell from anchors and dredgers, and partly because cable-laying ships move very slowly and would create an enormous traffic jam.
The only solution that is even remotely acceptable is to land the cable on Egypt's Mediterranean coast (which in practice means either Alexandria or Port Said) and then go overland to Suez, where the canal joins the Gulf of Suez, which in turn joins the Red Sea. The Red Sea is so shallow and so heavily trafficked, by the way, that all cables running through it must be plowed into the seafloor, which is a hassle, but obviously preferable to running a terrestrial route through the likes of Sudan and Somalia, which border it.
In keeping with its practice of running two parallel routes on terrestrial sections, FLAG is landing at both Alexandria and Port Said. From these cities the cables converge on Suez. Alexandria is far more important than Port Said as a cable nexus for the simple reason that it is at the westernmost extreme of the Nile Delta, so you can reach it from Europe without having to contend with the Nile. European cables running to Port Said, by contrast, must pass across the mouths of the Nile, where they are subjected to currents.
Engineer Mustafa Musalam, general manager of transmission for ARENTO's Alexandria office, is a stocky, affable, silver-haired gent. Egypt is one of those places where Engineer is used as a title, like Doctor or Professor, and Engineer Musalam bears the title well. In his personality and bearing he has at least as much in common with other highly competent engineers around the world as he does with other Egyptians. In defiance of ARENTO rules, he drives himself around in his own vehicle, a tiny, beat-up, but perfectly functional subcompact. An engineer of his stature is supposed to be chauffeured around in a company car. Most Egyptian service-industry professionals are masters at laying passive-aggressive head trips on their employers. Half the time, when you compensate them, they make it clear that you have embarrassed them, and yourself, by grossly overdoing it - you have just gotten it totally wrong, really pissed down your leg, and placed them in a terribly awkward situation. The other half of the time, you have insulted them by being miserly. You never get it right. But Engineer Musalam, a logical and practical-minded sort, cannot abide the idea of a driver spending his entire day, every day, sitting in a car waiting for the boss to go somewhere. So he eventually threw up his hands and unleashed his driver on the job market.
Charitably, Engineer Musalam takes the view that the completion of the Aswøan High Dam tamed the Nile's current to the point where no one need worry about running cables to Port Said anymore. FLAG's surveyors obviously agree with him, because they chose Port Said as one of their landing points. On the other hand, FLAG's archenemy, SEA-ME-WE 3, will land only at Alexandria, because France Telecom's engineers refuse to lay cable across the Nile. SEA-ME-WE 3's redundant routes will run, instead, along the Desert Road and the Agricultural Road. Bandwidth buyers trying to choose between the two cables can presumably look forward to lurid sales presentations from FLAG marketers detailing the insane recklessness of SEA-ME-WE 3's approach, and vice versa.
At the dirt-and-duct level, the operation in Egypt is much like the one in Thailand. The work is being done by Consolidated Contractors, which is a fairly interesting multinational contracting firm that is based and funded in the Middle East but works all over the globe. Here it is laying six 100-mm ducts (10 inside Alexandria proper) as compared with only two in Thailand. These ducts are all PVC pipe, but FLAG's duct is made of a higher grade of PVC than the others - even than President Mubarak's duct.
That's right - in a nicely Pharaonic touch, one of the six ducts going into the ground here is the sole property of President Hosni Mubarak, or (presumably) whoever succeeds him as head of state. It is hard to envision why a head of state would want or need his own private tube full of air running underneath the Sahara. The obvious guess is that the duct might be used to create a secure communications system, independent of the civilian and military systems (the Egyptian military will own one of the six ducts, and ARENTO will own three). This, in and of itself, says something about the relationship between the military and the government in Egypt. It is hardly surprising when you consider that Mubarak's predecessor was murdered by the military during a parade.
Inside the city, where ten rather than six ducts are being prepared, they must occasionally sprout up out of the ground and run along the undersides of bridges and flyovers. In these sections it is easy to identify FLAG's duct because, unlike the others, it is galvanized steel instead of PVC. FLAG undoubtedly specified steel for its far greater protective value, but in so doing posed a challenge for Engineer Musalam, who knew that thieves would attack the system wherever they could reach it - not to take the cable but to get their hands on that tempting steel pipe. So, wherever the undersides of these bridges and flyovers are within 2 or 3 meters of ground level, Engineer Musalam has built in special measures to make it virtually impossible for thieves to get their hands on FLAG's pipe.
For the most part, the duct installation is a simple cut-and-cover operation, right down the median strip. But the median is crossed frequently by nicely paved, heavily trafficked U-turn routes. To cut or block one of these would be unthinkable, since no journey in Egypt is complete without numerous U-turns. It is therefore necessary to bore a horizontal tunnel under each one, run a 600-mm steel pipe down the tunnel, and finally thread the ducts through it. The tunnels are bored by laborers operating big manually powered augers. Under a sign reading Civil Works: Fiberoptic Link around the Globe, the men had left their street clothes carefully wrapped up in plastic bags, on the shoulder of the road. They had kicked off their shoes and changed into the traditional, loose, ankle-length garment. One by one, they disappeared into a tunnel barely big enough to lie down in, carrying empty baskets, then returned a few minutes later with baskets full of dirt, looking like extras in some new Hollywood costume drama: The Ten Commandments Meets the Great Escape.
We blundered across Engineer Musalam's path one afternoon. This was sheer luck, but also kind of inevitable: other than ditch diggers, the only people in the median strip of this highway are hacker tourists and ARENTO engineers. He was here because one of the crews working on FLAG had, while enlarging a manhole excavation, plunged the blade of their backhoe right through the main communications cable connecting Egypt to Libya - a 960-circuit coaxial line buried, sans conduit, in the same median. Libya had dropped off the net for a while until Mu'ammar Gadhafi's eastbound traffic could be shunted to a microwave relay chain and an ARENTO repair crew had been mobilized. The quality of such an operation is not measured by how frequently cables get broken (usually they are broken by other people) but by how quickly they get fixed afterward, and by this standard Engineer Musalam runs a tight ship. The mishap occurred on a Friday afternoon - the Muslim sabbath - the first day of a three-day weekend and a national holiday to boot - 40 years to the day after the Suez Canal was handed over to Egypt. Nevertheless, the entire hierarchy was gathered around the manhole excavation, from ditch diggers hastily imported from another nearby site all the way up to Engineer Musalam.